Replace old r22 converted equipment with the customer supplied r410a heat pump and air handler. Changed metering device to match. Pressure tested system, vacuumed system. Performed charge rite. Re hooked up condensate drain lines of new unit to exsisting lines. Re did transition to duct work to fit new unit. Tested system, system cooling.