Made adjustment to flame rod and igniter Verified voltage upon start up for ignition Verified manifold ground screws tight Confirmed correct inlet gas pressure static and while under load Verified ohms resistance for gas control valve Confirm sizing for gas flex connector at unit Verified delta T for inlet and outlet water temperature at 3.5 gallons per minute all good Visual inspection inside unit confirms clean and presumably operational If problems persist according to manufacturer service manual new PC be required