Completed install multiple things not finished unit not working due to tripped wet switch safety switch due to drain lines not connected properly sloped properly (installed properly) finished install in multiple other locations wrapping insulation around metal ductwork that was an insulated correcting flue pipe touching wood combustible material insulation on line set corrected and finished drilled hole in concrete and attached pvc Outside above new drilled hole through concrete.