DCM22: A/C complete, replaced (3) 20x22x1, (2) 18x20x1, (6) 20x20x1, (1) 20x25x1, (2) 16x20x1, (8) 21 1/2x23 5/16x1 filters. All systems other than unit 4 are fully functional and operating within manufacturer specifications at this time, refrigerant pressures and temperatures are appropriate for outdoor and indoor weather conditions. System #4 is functional in A/C however the system still has all the previous problems (Unit #4 Jan 12, 2024 estimate). Set all thermostats back to auto and 78 cool . Maintenance checklist attached.


Rob  S.

Rob S. Job Checkin

Replaced thermostats for systems 7 and 14, put them on schedule and set them 2 cool/3 heat.


Rob  S.

Rob S. Job Checkin

Set charge on system # 14; add 2 pounds of R410 refrigerant. Replaced bolt in breakers ( 40 amp for #8 and 25 amp for #7 ) and tested systems. Both breakers are functioning as designed. Set charge on system # 7; added 2.5 pounds of R410 refrigerant. Need to return to replace thermostats on systems 14 and 7. Ensure thermostats are 3 heat / 2 cool heat pump thermostats.


Dobbs Technician A.

Dobbs Technician A. Job Checkin

Removed old equipment and installed new Rheem 4 ton heat pump and air handler. Installed new emergency drain pan, new pan safety switch, new coil safety switch, new return plenum with 20x20x1 filter, new thermostat and new composite pad for outdoor unit. Reconnected high voltage, low voltage, drain line, supply plenum and all duct work. Tested system operations in heating and cooling.


Dobbs Technician A.

Dobbs Technician A. Job Checkin

Removed old equipment and installed new 2 stage 2.5 ton heat pump with 3 ton 2 stage air handler. Installed new emergency drain pan, new pan safety switch, new coil safety switch, new condensation pump, new thermostat, new 16x20x1 filter rack with filter, and new composite pad for outdoor unit. Reconnected supply plenum, high voltage, low voltage and lineset. Tried testing system operations, breaker on outdoor unit has gone bad and not supplying proper voltage to unit. Unit will need new breaker.


Rob  S.

Rob S. Job Checkin

Added 1lbs of R22 Initially Superheat was 36* with a Subcool of 3* after adding refrigerant Superheat is now 20* with a Subcool of 10*, system’s pressure and temperatures are now appropriate for outdoor and indoor conditions. Temperature split between return and supply air is 21*


Rob  S.

Rob S. Job Checkin

Added 2lbs of R410A Initially Superheat was 35* with a Subcool of 3* after adding refrigerant Superheat is now 18* with a Subcool of 12*, system’s pressure and temperatures are now appropriate for outdoor and indoor conditions. Temperature split between return and supply air is 22*


Rob  S.

Rob S. Job Checkin

Added 2lbs of R410A, Initially Superheat was 40* with a Subcool of 3* after adding refrigerant Superheat is now 20* with a Subcool of 8*, system’s pressure and temperatures are now appropriate for outdoor and indoor conditions. Temperature split between return and supply air is 24*


Rob  S.

Rob S. Job Checkin

Added 3lbs of R410A Initially Superheat was 32* with a Subcool of 2* after adding refrigerant Superheat is now 17* with a Subcool of 9*, system’s pressure and temperatures are now appropriate for outdoor and indoor conditions. Temperature split between return and supply air is 21*


Rob  S.

Rob S. Job Checkin

Unable to replace breaker, breaker is a bolt in style 40 amp 2 pole GE type THQB, ordered through city electric in Hiram


Rob  S.

Rob S. Job Checkin

Added all units model and serial numbers into service titan, numbered all the units, Programmed thermostats to 60 heat and 78 cool.


Rob  S.

Rob S. Job Checkin

DCM2: Heat complete, replaced filters (2) F16251, systems are fully functional and operating within manufacturer design at this time, below is completed heat maintenance.


Rob  S.

Rob S. Job Checkin

DCM1 complete; Heat; (1) F20221 replaced. System is fully functional. All components are operating within manufacturer specifications. Refrigerant pressures and temperatures are appropriate for indoor and outdoor conditions. Heat checklist atrached


Cody C.

Cody C. Job Checkin

Replaced board tested operation everything is operating properly at this time.


Dobbs Technician A.

Dobbs Technician A. Job Checkin

Removed old furnace and installed new Rheem variable speed 2 stage gas furnace. Installed new return plenum with 16x25x4 filter, new emergency drain pan, new pan safety switch, and new thermostat. System did not start up due to no high voltage going through control board. Need to verify control board is bad, replace, and test system operations.