Removed old equipment and installed new Rheem 2.5 ton heat pump and 3 ton air handler. Installed new pan, safety switch, new coil safety switch and new thermostat. Reconnected supply plenum, return plenum, high voltage, low voltage, and drain line. Tested system operations, set refrigerant charge.