Removed old equipment and installed new Rheem 3 ton 2 stage heat pump and air handler. Installed new return plenum with 16x20x1 filter, new emergency drain pan, new pan safety switch, new coil safety switch, and new composite pad for outdoor unit.reconnected supply plenum, high voltage, low voltage, drain line and all return ducts. Tested system operations in heating and cooling, set proper charge.