We remove any existing refrigerant, we remove the evaporator coil and supply plenum. We install a new evaporator coil, supply plenum, drain pan and in-line safety switch. We install a new line drier, pulled a vacuum to 500 microns and recharge the system to manufacture specs. We tested operations everything is working properly at this time.