145 S William St
Newburgh, NY 12550
(845) 562-6722

Job Locations
for cold spring, ny


Map of Cold Spring NY
Casey M.

Casey M.


Job Checkin

1. Disconnected both the hydronic loops and ground source loop from the pump back. 2. Disconnected the line voltage and the auxiliary heat strip from both the air handlers and the electric panels respectively. 3. Disconnected the 24 volt control wiring from both air handlers and the condensation.