Follow up call: Arrived, greeted Molly and proceeded to bleed and purge all six(6)zones. The system was air bound. I also called Hydrolevel Controls to walk me through the parameters of the controller on the boiler. Made a couple of adjustments. I fired up the boiler. I observed it run cycle and reach temperature. All is good and the boiler is opals it should.