Technician arrived onsite. Had to remove shelving and cut 2 holes in the cabinet to fit new piping through. Installed HALO 5 with new 1" PRV. Ran 1/2" backwash line. Started the system on a cycle wash and no leaks. Hawthorne PHC job complete.