Customer request sidekick inspection service performed site pick inspection service removed inspected and clean flame sensor adjusted gas pressure to 1.9 on first date and 3.5 inches of water column on second stage. Found system is operating properly with a 42° heat rise Inspected cooling system checked refrigerant level found refrigerant level is OK Cooling system is operating properly with a 19° temp split