03JUN2024 Jason Brown Arrived to repair connection between polypropylene well tube and pvc connection. Replaced existing fitting with shark bite. Opened the water lines and it’s leaking on the copper side. Called Barbaras plumber with her. We left a message and I will follow up tomorrow around 1pm to verify scheduling. we will cover the cost of the repair.