Tech preformed CMA FULL SERVICE on 5 Gas Package Units. All Systems are operating at this time but have some challenges. Gas Pack #2 still present same challenge as previous CMA Visit. System is operating at this time but is in need of condenser fan motor and capacitor. Gas Pack #1 is in need of a fan capacitor but is operating at this time. Gas Pack #4 is in need of 3 fan capacitors but is operating at this time. Tech has attached estimates to invoice for repairs needed. Customer spoke with tech about ceiling leaking in women’s bathroom. Tech was unable to locate leak coming from unit on roof above women’s bathroom. Drain pan is intact and drain is flowing properly. Tech did find that roof top does retain water and debris around unit. Tech suspects leak in roof membrane. Tech has attached pictures to invoice. Tech has also attached SYSTEM PERFORMANCE REPORTS to invoice along with pictures.