Performed CMA Inspection on 2 Gas Pack systems. - On todays visit there were no challenges with Gas Pack #1 or Gas pack #2. - Tech replaced 4-20x24x2 filters and 4-20x20x2 filters. - Tech flushed drain lines and added condensate treatment tablets to drain pans. - Fan, compressor and blowor motor amperage were inside correct specifications on both Gas package systems. - All systems are performing properly and have a Delta T of above 18 degrees. - There are pictures and a performance report attached to this invoice.