Tech replaced 50ft of line set, all joints were brazed while flowing nitrogen, filter dryer replaced. Pressure tested and evacuated the system below 500 microns. Factory charged the system with R410a refrigerant. Tested system operation afterwards and covered the line set with line-hide.