Performed clean and check for heat pump heating and backup electric furnace confirmed operation of reversing valve checked filter and heat rise in heat pump mode confirmed proper operation of the defrost board, switched system to electric heat tested and inspected all electrical components and controls checked relays inspected blower wheel for dirt or obstructions all operations are normal at this time.