Today we got the line set made and hung in the closet. We then were able to get all line set connected and ran nitrogen pressure tests. We then vacuumed out the line set with the vacuum pump. We finished all the electrical connections at the outdoor unit and indoors. We fired the unit up and finished the installation process. Unit is running smooth and proper. We finished the day by doing a proper cleaning of the work area.