25% DEPOSIT REQUIRED IN THE AMOUNT OF $4,711.75 Balance Due in the amount of $ 11,735.32 Upon Final Inspection and Completion Replace one (1) 2.0 ton split AC system. Replace one (1) 2.5 ton split AC System. Rheem product or equal depending on availability.