Upon my arrival today, the customer greeted me at the front door. They then allowed me to come inside and we met with the builder. They wanted a price to move the return ductwork because they are remodeling the inside of the home. I got in contact with Ryan Goring. And he’s building up the estimate and sending it over to the builder. I was unable to check that system out today because of the remodeling that was going on. I did check out the second system on the right side of the home. On that system, everything did check out good. I am giving the customer the option to do a two system duct cleaning once everything is finalized in the home to make sure that there isn’t a large amount of excess dust floating around in the home. All other information on the system is in my check sheet which I have emailed over to the customer.