We pulled and reset the toilet in the master bathroom to stop leaking. We rebuilt the master bathroom toilet and upstairs hallways bathroom. Installed new Kohler toilet on the main level also replaced to popup assembly in the master bedroom. Replaced showerhead in the master bedroom and tub spout in the upstairs hall bathroom. Replaced angle stop in the downstairs bathroom.