PSI 55. All toilets are original from 1997 and need attention soon. We already did a major rebuild on master bathroom toilet because of a leak. Water heater is from 2007 and built into a small room. In order to remove and install new water heater a wall must be cut out. All else seems well at this time. Customer does not want to do any work at this time.