Replaced failed 3 handle tub and shower valve in master bath room with new 3 handle tub and shower valve. 2 year parts and labor warranty Wall had to be cut to access valve. Panel was put in place. No warranty Replaced old worn tub waste and overflow with new pvc tub waste overflow.