Phase two of an HVAC unit replacement scheduled today with a corrected curb at a restaurant in Anaheim, CA. Our installation team set the unit on its new curb, sealed all duct connections, ran new wiring, drain lines and gas lines. Added the new economizer and strapping. Powered up system and tested operations. Unit is online, job complete.