On arrival: Checked in with store manager. Gained roof access. Hauled all necessary tools and parts up to roof. Removed failed TXV. Installed new TXV. Pressure tested system up to 350lbs. Pressures held. Put system on a vacuum down to 500microns. Introduced charge to system, 13lbs 5oz. System is running optimally. Obtained signature on work acknowledgment.