On arrival set units to call for heat measured supply and return air temp measured voltage and amps inspected electrical wiring electrical wires and inspected water pressure and raised it.checked coils,Contactors.caps.replaced package unit cap.rated for 80 uf and actual was 63 .all units are operating normal at this time