Fall pm on 01/27/20 On arrival set unit to call for heat measured supply and return air temp measured voltage and amps inspected electrical connections checked drain checked air filter and replaced checked blower motor checked coil checked all other electrical connections in door unit checked condenser unit outdoor checked electrical connections checked compressor capacitor checked voltage and amps checked pressure and temp and they are ideal indicating zero leaks checked all other electrical connections unit tested unit operating normal at this time. Recommended Ez trap installation Duct cleaning also Uv lights installation and hole house surge protector installation to avoid future problems.