Installed Low Flow Center above Dual flow center. Used fusion gun to seal piping. Flushed loop for about an hour and found no leaks. Filled up reservoir then opens up valves. Reinsulated piping while we tested units. Normal water flow and heat rejection on both systems. Left gallon of loop fluid for customer to fill himself if needed.