On arrival set units to call for cooling measured supply and return air temp measured voltage and amps inspected electrical connections checked drain and cleaned it and checked water pressure and raised it,also replaced caps on both units,checked contractors,coils,also recommended replacing disconnect box for synergy unit .units are operating normal at this time