Return visit to install Uv lights On arrival turn the unit off from disconnect box installed Blue Tube Uv lights for both units rewire low voltage wires tested checked electrical connections checked voltage and amps measured supply and return air temp checked all other electrical connections unit start operating very smoothly without any hesitating or lag units operating normal at this time. Collected job balance $ 1361.50 on C.C on file.