Spring Pm On 05/02/19 On arrival set unit to call for cooling measured supply and return air temp measured voltage and amps inspected electrical connections checked drain and cleaned checked filters cleaned checked condenser coil outdoor checked psi checked compressor capacitor checked all other electrical connections unit tested unit operating normal at this time.