I completed a callback install. Had to secure Plenum to the floor joist, re-fabricate transition from Plenum to furnace, move drop over and add a better filter rack to bring the installation of the Five Star furnace to standards. I will be giving the client two extra filters (16x25x4) to replace the ones that he has already purchased online.