Today I got a lot done at the Hillsboro Building in Nashville, TN! I changed sump pump in pit of elevator #1 to 63 gallon an minute. Elevator #2 installed raceway and Octagon box for each landing 3rd, 2nd, 1st & basement floors. Started to frame ceiling for Sheetrock. Installed 1900 box for new light switch and GFCI.