Responded to call for completing work discussed on previous visit. Upon arrival customer agreed to option. Installed new hot feed to right side of the home. Installed new customer supplied flood light on new hot feed. Installed new customer supplied photocell on new fixture. Tested new fixture. New fixture is operating properly at this time. Relocated flood light fixture on left side of home from roof line to eve level between the 1st and 2nd story of the home. Installed new customer supplied fixture. Tested new fixture. Fixture is operating properly at this time. Inspected electrical panel. Found burnt wires and double tapped neutrals in the electrical panel. Advised customer of the findings. Customer agreed to new option. Replaced all circuit breakers in the electrical panel. Did not replace main breaker. Installed an additional ground bar. Relocated all grounds double tapped with neutrals to new ground bar. Separated all double tapped neutrals. Tested all repairs. All are o