CO2 Suppression, Clean Agent Suppression, and Alarm Systems Inspection Annual Inspection of CO2 Suppression Systems (6 systems) Unit 1-2 Shutdown from 10/8 - 10/19 Unit 5-6 Shutdown from 10/22 - 11/2 Unit 3-4 Shutdown from 11/5 - 11/9 Annual Inspection of Pro-Inert Suppression Systems (7 systems) Unit 1-2 Shutdown from 10/8 - 10/19 Unit 5-6 Shutdown from 10/22 - 11/2 Unit 3-4 Shutdown from 11/5 - 11/9 Annual Firework System Inspection (1 system) Inoperable Deficiency: Trouble Shot horn Strobe Trouble In Unit 2 and discovered that a module had been “blown”, refer to pictures. Need to replace SIGA -MCC1S modules. Possibly 2 modules.