We are pleased to inform you that the winterization of your irrigation system has been successfully completed, ensuring that your system is protected from potential freeze damage during the colder months. While proceeding with the blow out, we noticed the following issues and provided recommendations for repairs or upgrades as needed. ___________________________________________________________________ Zone 1: Zone is operational at this time. Zone 2: Zone is operational at this time. One spray head leaking directly to the left of front door. Zone 3: Zone is operational at this time. Zone 4: Zone is operational at this time. Zone 5: Zone is operational at this time. Zone 6: Zone is operational at this time. Zone 7: Zone is operational at this time. One leak in bed with tree in center of it on driveway wil need to fix in spring. Zone 8: Zone is operational at this time. Zone 9: Zone is operational at this time. Zone 10: Zone is operational at this time. __________________________