Today’s visit we replaced the backflow up to code and worked on the following zones, Zone 1 installed a 6” prs head, zone 2 replaced 2 nozzles, zone 3 fixed pipe and installed 3 6” prs heads and zone 4 installed 6” prs head. This job we took care of the leaks and got the system back up working.