Work performed: Zone 1, three rotor heads, two 12” heads and repaired pipe break Zone 2, replaced one 4” head with 6” head w/pipe break and replaced four spray nozzles Zone 4, replaced two rotors w/ two pipe breaks Zone 10, replaced one rotor - Replaced leak shut off valve for irrigation just before back flow assembly ** Please see attached estimates/forms for system and controller details ** - My card is also attached, so feel free to to contact me for any questions or concerns