System check at this time we found 20 leaking rotors, 7 leaking popup heads 2 pipe leaks and a leaking valve.DCA has broken handles . At this time we replaced 20 rotors,7 popups, repaired 2 pipe leaks. We also replaced Dca ,replaced the leaking valve and installed 3 risers. System is now fully operational.