During the system check, multiple pipe brakes were found throughout the property. There were two lateral line pipe brakes that were found for zone four, and a break in the mainline that were all flagged to be repaired. A total of 22 pop up spray heads, were flagged to be replaced due to the heads, either leaking at the base of the stem and body, or not retracting after the zone was shut off. When checking the valves at the controller, they all registered between 80 and 85 ohms. This was brought to the client’s attention and was made aware that they might fail mechanically, or electrically in the future. He was made aware of the zones potentially staying on, or not turning on if at some point, they do fail. All of the issues listed above were presented to the client, and approval was given to repair the lateral lines, and the mainline. An estimate with all of the remaining repairs will be sent to the client with the invoice for the work that was completed during today’s visit.