Tech utilized hidden isolation valve (above duct work) to shirt off the water for the gara area hose bib. Once water was off and drained old hose bib was cut and removed and a new wolverine brass FF house bib was installed. Water was turned on and fixture tested to ensure no leaks or malfunction.