Pull 2 toilets and line pipe with epoxy 95 feet. ================================== -First we will dig and remove the clean in the front of the building -We will remove two toilets -We will chain knock (picote) the cast iron line -We will hydroscrub from toilets to cleanout -We will dry out line -We will epoxy 95 feet of cast iron main -We will reinstall new PVC cleanout -We will reset toilets with new wax ring and caulk