13625 50th Way N, Suite 26
Clearwater, FL 33760
727-285-8559

Our Top Cities


Job Locations
for palmetto, fl


Map of Palmetto FL
Joseph  P.

Joseph P.


Job Checkin

The main sewer line in the front yard is bellied and holding water in 2 different sections. Recommend replacing 20 foot section of main line. 30 feet from cleanout to city connection. 33 feet to 38 feet from cleanout is bellied and holding water. 43 feet to about 46 feet is bellied and holding water as well. Dig up main line in front yard and cut out 20 foot section. Replace with schedule 40 pvc. Permitting and inspection. 5 year warranty on our work. 3 year warranty on section of pipe under house that was hydro scrubbed.