We will install flex gas line 30 ft From meter to new location We will install two 3/4 risers We will install two ball valves We will reconfigure gas pipe at meter to increase two 3/4 We will permit and inspection Trench will be 18 inches deep Tracer line will be attached on top of flex line One day job time line