Gave estimate for tub to shower conversion. Would need to cut and demo tile to allow for new shower valve install. Would cut and remove bath tub. Install shower base and hook up drain. He is looking to move forward with this soon but is waiting to hear back from the VA. Also wants a water softener installed. Will follow up once Nelsen sends estimate for softener.