Install new 3/4" Type - L, copper water main starting from water meter up to water service connection at building 128. Installed new shut off, loose key hose bib, and shut off valve to sprinklers. Continue 3/4" copper water main around building connecting to water main at backside of fense. 78' total copper piping. Back fill and compact soil.