Maineville, OH Replaced garbage disposal with customer supplied one. Replaced upstairs bathroom tub/shower with new Moen Eva trim as well as brushed nickel waste and overflow trim. Repaired hot water leak underneath jacuzzi up in master bathroom. Also attempted to snake outside drain at bottom of stairs to basement. It is inundated with lots of dirt. Recommended jetting, or quote to install additional sump crock for this drain.