TECHNICIAN NOTES: came out today to perform of scope of work for a connection at fireplace area, and possibly at meter as of today pipe at meter goes from 1 1/4 to 1 inch at top, gas line has been put down and set up near fireplace area which we will drill a hole through stone side and leave it stubbed to were contractor will deal will connection at fireplace.