831 S 8th St
Mebane, NC 27302
(919) 246-6505

Job Locations
for chapel hill, nc


Map of Chapel Hill NC
Aris S.

Aris S.


Job Checkin

Install Navien NPE-180A on Exterior Wall of Home -Includes Drain, Removal, and Disposal on Old Tanked Unit. Cap Water Lines Coming Out From Wall. Remove Gas Line and Cap Line at Branch In Crawlspace. -Tankless Unit will Be Hanging Outdoors, with Outdoor Kit for Venting, and Isolation Valves for Future Flushing. -Run Approximately 40’ of Water Line. Sleeving Water Line through Foundation. Tie into Existing Polybutylene. -Run 15’ of 3/4” Gas Line, from Gas Meter to Unit, with Union, Drip Leg, and Gas Regulator -Install Whole House Gas Regulator for Remaining Gas Units, with Drip Leg, and Union. -Schedule Electrician to Install GFCI Protected Outlet for Unit -Schedule for Final Inspection from the City -Includes Service Partner Plan: Annual Whole House Safety Check, Annual Tankless Flush, No Dispatch Fees, 10% SPP Discount, Up to 5 Years Parts and Labor Warranty I arrived today to take a look at a water heater that was not functioning. The homeowners realized this Sunday evening. The wa