Examined unit (Reach=In Cooler). Evaporator clear. Compressor on roof. Gauged system and found cycling on Hi pressure due to head master control valve. Customer is ordering part. -- Recovered refrigerant (their equipment). Removed and installed a new headmaster control valve an drier (customer provided drier). Evacuated and recharged system (customer supplied refrigerant). Checked operation.