Started day one of remodel. Provided and installed new ice maker box and main water shutoff valve located in the hallway closet. Repipe sections of water piping in crawl space. Provided and installed new quarter turn emergency shut off valves for the kitchen sink. Turned water on and tested for leaks. No leaks were detected. Everything is in good working condition at this time.